Notice of commencement of construction works

Recently, the Law of Ukraine “On the Regulation of Urban Development Activities” underwent changes, which affected the system of permit documents for construction works. Previously, there was a three-stage system, where one of the documents was a declaration on the start of construction. Now the system is two-stage, with a notification of the start of work and a permit for their implementation.

Main changes in legislation and benefits

Difficulty categories are replaced by consequence classes:

  • Instead of five categories of complexity, objects are now classified by three classes of consequences (responsibility): CC1, CC2, CC3.

Grounds for starting construction:

  • Currently, either a notice or a permit is required to begin construction.

Notification of the start of work:

  • Issued for small objects.
  • It can be submitted on the basis of a construction passport (for individual residential buildings, garden buildings, garages, etc.) or MBUO (for SS1 objects).

Work permit:

  • Obtaining a permit is necessary for large SS2 and SS3 facilities.

Notification of the start of construction work: how to do it?

Notice of commencement of construction works (PPBR) is a document submitted by the customer before the commencement of construction works.

There are two ways to submit PPBR:

  • In electronic form: through the Diya Portal or the Unified State System of Electronic Petitions (EDESO).
  • In paper form: through the Administrative Services Center (CSC).

Documents required for submission of PPBR:

  • Passport and identification code of the customer (for an individual) or founding documents (for a legal entity).
  • A document confirming ownership or use of a plot of land.
  • Building plan or construction passport.
  • Construction project (approved in the appropriate order).
  • Expert report on environmental impact assessment (if necessary).

Process of submission of PPBR:

  1. Fill out the PPBR form. The PPBR form can be found on the Diya Portal or in the Central Administrative Office.
  2. Prepare the necessary documents.
  3. Submit PPBR:
  4. Get a PPBR registration number.
  5. Start construction work.

Difficulties are possible when notifying about the start of construction work

There are a number of potential difficulties that individuals and firms may face when trying to submit a notice of commencement of construction work. Some of them include:

  1. The rules and requirements for filing a notice may be inconsistently stated or may not be clear enough for applicants.
  2. It is not always clear what documents are required for notification. This may cause a delay in the process.
  3. There are certain technical requirements to be followed when completing and submitting a message, such as file formats, document size, etc.
  4. Sometimes information about the time frame for submitting a notice may be unclear or contradictory.
  5. Even small errors or incorrect data can lead to rejection of the message.
  6. Some properties may have specific documentation or permit requirements, which can complicate the process.
  7. In case of questions, individuals may need to consult with specialists for the correct execution of the message.

Avoiding these complications can be ensured with the help of experts of our law firm “Prykhodko and Partners”.

Specialist help

Our company is ready to provide you with comprehensive support at every stage of your construction project.

  1. Defining the consequence class of your object. Our qualified specialists in the field of urban planning will help you correctly determine the class of consequences of your building object. We carefully analyze all the factors affecting the safety and risks of the project and will ensure an accurate classification in accordance with all requirements and standards.
  2. Completion of necessary documents (notification/permit). Our team of experts will provide you with professional processing of all the necessary documents, including notification of the start of construction work and obtaining a building permit. We will undertake the entire process of preparation, filling and submission of documentation, so that you can be sure that it meets all the requirements and regulations of the law.
  3. The fastest and most economical documentation process. We understand how important it is to efficiently complete construction projects, so our team is focused on making the entire process as quick and cost-effective as possible for you. We use optimal strategies and technologies, minimize delays and costs, so that your project is completed successfully and on time.

Fill out the form below if you need legal advice or the cost of assistance in issuing a notice of commencement of construction work.

Calculate the cost of services

1 question

Do you need to make a notification about the start of construction work?

Yes
No

2 question

Is the building located in Kyiv?

Yes
No

3 question

Is it planned to start construction work in the near future?

Yes
No

Specializes in real estate registration, solving various issues related to putting into operation, reconstruction, redevelopment, unification, division of real estate objects. Land issues, concluding agreements with real estate.

Contact now
How helpful was the article? Rate:

5

Count of grades:

12

20%
discount
If we do not
call back
during the day
Consultation
Law Company
Leave a request for legal assistance right now:
The best lawyers
Fair price
We work quickly
Online / offline consultation